T IME
​
&
​
COSTS

T IME & C OSTS A NALYSIS

Time & Costs are two of the most important aspects to consider
for obtain a good business plan of one Project.

DESIGN TIME
​
10 / 30 Business Days from the definitive file CAD of the boat, to the moulds kit
ready for the delivery.
It depends on the dimension of the boat and the complexity of the surfaces to recreate.
​
SHIPMENT TIME
The Shipyard is free to decide which is the best & cheaper way to transport the kit moulds,
Considering that, Up to 150’ only one container is needed to deliver one mould all around the world without the need of exceptional transport.
​
MOUNTING TIME
Compared to the traditional moulds, with the direct female moulds, the shipyard
can be ready for the first lamination at the same time needed to build
the male plug.
​
DURATION TIME
All MYD moulds are designed for the infusion & pre-preg building technology,
with particular care to the details of the structure.
(Iron Basement – Stations – Spacers – Battens – internal Cover – Flange).
The maximum precision of the global structure is obtained using power CAD software
and laser cutting machine with global tolerance of 0,1 mm.
​
The material, the thickness, and the dimension of any single part are calculated to obtain a strong and durable moulds.
​
Many examples can be found on our customer's website.
At the moment the most used Hull & Deck female moulds are in South Africa,
SWS shipyard that have built 15 Sailing Boat of 100', made with infusion technology and using also the moulds as an oven for the post-cure up to 80 °C.
​
DISMANTLE TIME
All our moulds Kit are very easy and fast to dismount, and in respect of the environment the bigger parts of the structures are made with recycled wood ♻︎
that don't need special waste disposal.
SAVE TIME
The MYD concept is to obtain the maximum quality of the moulds surfaces,
improving, simplifying and reducing at minimum the handwork in the shipyard.
​
